Provided as is. TFI products are tools to help you work, not legal, tax, medical or financial advice. Check every result and confirm the rules where you work before you rely on it. Terms · Privacy
TFI Storefront / Skills / Auto and Transport
🚗

Labor Time Estimator from Flat-Rate Guide and Shop History

Takes the flat-rate guide times the owner or service writer types in, compares them with how long the shop actually took on similar jobs, and produces a labor hour estimate with a clear reason for each line.

Auto repairAuto and Transport✓ Checkedv1.2

Before and after

BEFORE · what the owner typed
2014 Silverado 1500 5.3, 163k. customer wants water pump, serp belt, and thermostat. guide says WP 2.6, belt 0.4, tstat 1.1 (using the guide we have in the shop software). we've done 4 water pumps on these, took 2.2, 2.5, 2.8, 2.5. belt we usually do in 0.3 never more. tstat we did 2 of them, 1.0 and 1.2. belt has to come off for the pump anyway and tstat is right there too, i think guide gives overlap on the tstat about 0.5 shared with the pump. truck is from up north so probably rusty, add 0.5 for bolts. rate is 140/hr.
AFTER · what the skill produced

Labor estimate: 2014 Chevrolet Silverado 1500, 5.3 engine, 163,000 miles

Jobs and times

  1. Water pump

    • Guide: 2.6 hours
    • Shop history: average 2.5 hours across 4 jobs (2.2, 2.5, 2.8, 2.5; total 10.0 divided by 4)
    • Recommended: 2.6 hours. History is within 15 percent of the guide, so we recommend quoting the guide time.
    • Dollars: 2.6 x 140 = $364.00
  2. Serpentine belt

    • Guide: 0.4 hours
    • Shop history: usually 0.3 hours (no job count given, so treat as an informal figure)
    • Recommended: 0.4 hours. We recommend the guide time because the history is not backed by a job count.
    • Dollars: 0.4 x 140 = $56.00
    • Note: you said the belt has to come off for the pump. You did not say whether the guide already counts that, so see the confirm list.
  3. Thermostat

    • Guide: 1.1 hours
    • Shop history: average 1.1 hours across 2 jobs (1.0 and 1.2). History is thin.
    • Recommended: 1.1 hours, the guide time.
    • Dollars: 1.1 x 140 = $154.00

Adjustments

  • Shared labor with the water pump: minus 0.5 hours, as you described (-0.5 x 140 = -$70.00)
  • Rust and seized bolts allowance: plus 0.5 hours, as you described (0.5 x 140 = $70.00)

Totals

  • Guide-based jobs: 2.6 + 0.4 + 1.1 = 4.1 hours
  • Adjustments: minus 0.5 plus 0.5 = 0.0 hours
  • Total labor to quote: 4.1 hours
  • At $140 per hour: 4.1 x 140 = $574.00

Confirm before quoting

  • Does the guide already include belt removal in the water pump time? If yes, the belt may be a double charge, and we recommend removing its 0.4 hours (total would be 3.7 hours, or $518.00).
  • Is the 0.5 shared labor between the pump and thermostat already built into the guide's thermostat time? If so, do not subtract it again.
  • The rust allowance is a guess. We recommend telling the customer it may change if bolts break, and getting approval before adding time.
  • Confirm any local rules on written estimates and customer approval before sending.

What it does

Takes the flat-rate guide times the owner or service writer types in, compares them with how long the shop actually took on similar jobs, and produces a labor hour estimate with a clear reason for each line. It flags overlapping labor so the customer is not charged twice for the same work.

Use it when: Use when an auto repair shop needs to build a labor time estimate for a job from flat-rate guide entries and the shop's own history, such as "how many hours should I quote," "estimate the labor on this," "what's the book time," or "how long does this usually take us."

TFI STOREFRONTTOOLS · SKILLS · HELP FOR SMALL BUSINESS

Tools, AI skills and hands-on help for small businesses, from Thompson Foundry Innovations.

CONTACT US
© 2026 Thompson Foundry Innovations LLC · Designed and built in Fullerton, California