Electrician Estimate Builder
Turns your site notes and prices into a clean written estimate the customer can read and approve line by line.
Before and after
Estimate from Laurelhaven Electric
170 Heronhaven Ave, Cranedale | 262-555-0172
Prepared by: Peter Mitchell
Prepared for: Penny McLean, 8691 Harrowhaven St, Cranedale | 262-555-0173
Hi Penny, thanks for having us out. Here is what we found on the two things you asked about, plus the other items we noticed during the visit.
Your warm outlet by the fridge: The outlet face is discolored and the back of it has burn marks, and the wire insulation behind it is browned. That is why it felt warm. We recommend replacing the outlet and redoing the damaged wire.
Your garage outlet that keeps tripping: The GFCI outlet in the garage trips all the time because the unit is bad. We recommend replacing it.
Safety concern, recommended now
- Kitchen outlet behind the fridge
Found: Burn marks on the back of the outlet and browned wire insulation.
We will: Replace the outlet, cut back the damaged wire, and redo the connection.
Labor $145 | Materials $22 | Line total $167 - Attic junction box over the hallway
Found: Spliced wires with no cover on the box.
We will: Tidy the splices and add a cover.
Labor $60 | Materials $9 | Line total $69
Group subtotal: $236
Recommended now
3. Garage GFCI outlet
Found: The unit trips all the time.
We will: Replace the GFCI outlet.
Labor $85 | Materials $38 | Line total $123
4. Front porch light
Found: The cover is cracked and there is water inside the fixture.
We will: Replace the fixture.
Labor $55 | Materials $29 | Line total $84
Group subtotal: $207
Also recommended
5. Hallway smoke alarm
Found: The alarm is chirping, and its label shows it was made in 2009.
We will: Replace it with a new smoke alarm.
Labor $40 | Materials $34 | Line total $74
Group subtotal: $74
Totals
- All five items: $517
- Safety concern and Recommended now items only (items 1 to 4): $443
Terms
- This estimate is good for 30 days.
- All five items can be done in one visit, about half a day.
- Payment is due when the work is done.
Your decision on each item
Item 1: Approve / Decline
Item 2: Approve / Decline
Item 3: Approve / Decline
Item 4: Approve / Decline
Item 5: Approve / Decline
Any item you decline is recorded as your decision.
Questions for the owner
- Should sales tax be added? No tax rate was given.
- Is a deposit required, or only payment at completion?
- Do any of these jobs need a permit or inspection here? Please confirm locally and tell me so I can add it.
- What is your policy if something unexpected is found once work starts?
- What dates are open for the half-day visit?
What it does
Turns your site notes and prices into a clean written estimate the customer can read and approve line by line. It groups the work by what you found, shows labor and materials for each line, and gives totals, including a total for partial approval.
Use it when: Use when an electrician needs to turn site notes, a walkthrough, or a rough list of jobs and prices into a clear written estimate for a customer, such as: build an estimate, write up a quote, price this out, or put these notes into an estimate.