Pool Winterization Checklist and Quote
Turns the owner's notes about a pool closing into a job checklist for the crew and a clear quote for the customer.
Before and after
CREW CHECKLIST: Hudson pool, 679 Bramview Rd, Thornhill (Oct 14)
Pool: in-ground vinyl liner, kidney shape, about 18,000 gal
- [ ] Balance water and add closing chemical kit
- [ ] Skim, brush, and vacuum
- [ ] Lower water level (confirm level with the owner)
- [ ] Drain Hayward sand filter, pump, and heater
- [ ] Blow out plumbing lines and install plugs
- [ ] Remove and store Polaris auto cleaner
- [ ] Remove ladder
- [ ] Remove and store slide
- [ ] Winterize heater (water side only, no gas line work)
- [ ] Remove old solid cover
- [ ] Install new mesh cover and secure it
- [ ] Photograph finished pool and note any pre-existing damage
- [ ] Note the cracked skimmer faceplate with seepage at the base and photograph it
QUOTE from Copperview Pool Care
Prepared for: Chen Hudson, 679 Bramview Rd, Thornhill, 336-555-0143
Closing date: October 14
Closing services
- Basic closing: $285.00
- Chemical kit: $48.00
- Plumbing blowout and plugs: $60.00
- Remove and store slide: $45.00
- Heater winterization: $75.00
- New mesh cover, installed: $640.00
Subtotal: $1,153.00
Tax (7 percent on the chemical kit and cover, $688.00): $48.16
Total for closing: $1,201.16
Recommended now
- Skimmer faceplate is cracked and water is seeping at the base. We recommend replacing it: $95.00
If you approve the faceplate replacement, the total becomes $1,296.16.
Deposit: 50 percent. On the closing total that is $600.58, or $648.08 if the faceplate is included.
Gas line work on the heater needs a licensed gas technician. Our heater winterization covers the water side only.
To approve, reply to confirm the quote and tell us whether to include the faceplate. If you decline it, we will record that as your decision.
Questions for the owner
- What water level should the crew lower the pool to?
- Does the tax apply to the faceplate if it is added?
- When is the deposit due, and how is the remaining balance paid and when?
What it does
Turns the owner's notes about a pool closing into a job checklist for the crew and a clear quote for the customer. Handles basic closings and jobs with extras like cover repair, equipment removal, or heater service.
Use it when: Use when a pool service needs a winterization checklist and quote for closing a customer's pool for the season, such as: "write up a pool closing quote," "winterization checklist for this pool," or "price out closing the Hendricks pool."