Turns a surveyor's rough site notes into an organized design brief the designer can work from without calling the surveyor.

SolarHome Services and Trades✓ Checkedv1.0

Before and after

BEFORE · what the owner typed
Elkshire Solar. Survey for Ariel Pham at design. Customer Annette Myers, 1398 Crowshire Rd, Slateglen, cell 330-555-0104. Survey done by Antonio OBrien. She wants to cover most of her bill, uses about 11,200 kwh a year per her bills. Battery maybe later, not now. No panels on the front of the house. Roof 1 rear, faces S, 6/12, comp shingle about 12 yrs old, 34 x 15 ft, 2 box vents and 1 plumbing stack. Rafters 2x6 at 24 oc, sagging a bit mid span on the left side. Roof 2 garage, faces W, 4/12, comp shingle, 20 x 14, clear of obstructions. No attic access so no rafter info. Roof 3 front faces E, skipped, customer doesn't want panels there. Big oak at back SW corner, shades left side of roof 1 in the afternoon. She might trim it, not sure. Main panel inside garage, 200A main, 200A bus, 2 open slots. Meter outside on garage wall, left side. Utility not confirmed. Panel photo taken. Attic over house: junction box near the hatch with no cover, wires exposed. 2 cracked shingles on roof 1 near ridge. Side yard gate locked, she has to let us in. Dog named Moxley, friendly but loose in the yard.
AFTER · what the skill produced

DESIGN BRIEF

Job basics

  • Customer: Annette Myers, 1398 Crowshire Rd, Slateglen
  • Phone: 330-555-0104
  • Surveyed by: Antonio OBrien, Elkshire Solar
  • Brief for: Ariel Pham

Customer goals

  • Cover most of her electric bill. Her bills show about 11,200 kWh used per year.
  • Battery maybe later, not now.
  • No panels on the front of the house.

Roof planes

  • Roof 1 (rear): faces south, 6/12 pitch, composition shingle about 12 years old, 34 x 15 ft. Obstructions: 2 box vents and 1 plumbing stack. Rafters are 2x6 at 24 inches on center, with some sagging mid span on the left side.
  • Roof 2 (garage): faces west, 4/12 pitch, composition shingle (age not noted), 20 x 14 ft. No obstructions. No attic access, so no rafter information.
  • Roof 3 (front): faces east. Skipped because the customer does not want panels there.

Shading

  • A large oak at the back southwest corner shades the left side of Roof 1 in the afternoon. The customer may trim it but is not sure.

Electrical

  • Main panel is inside the garage: 200A main, 200A bus, 2 open slots. A panel photo was taken.
  • Meter is outside on the left side of the garage wall.
  • Utility details are not confirmed.

Access and site notes

  • The side yard gate is locked. The customer must let the crew in.
  • A friendly dog named Moxley is loose in the yard.

Findings
Safety concern, recommended now

  • In the attic over the house, a junction box near the hatch has no cover and the wires are exposed. We recommend a licensed electrician look at it.

Recommended now

  • Two cracked shingles on Roof 1 near the ridge.
  • Roof 1 rafters are sagging mid span on the left side. We recommend a structural engineer look at it.

Also recommended

  • Roof 1 shingles are about 12 years old. We recommend the customer and designer talk about roof condition before panels go on.

Missing from the survey

  • Rafter size and spacing for Roof 2
  • Age of the Roof 2 shingles
  • Roof 3 measurements (skipped by request)
  • Utility name and interconnection details
  • Whether the oak will be trimmed

For licensed professional review

  • Sagging mid span on the left side of the Roof 1 rafters, for a structural engineer
  • Exposed junction box wiring in the attic, for a licensed electrician
  • Panel and open slot details, for the designer to confirm with the utility and local building office

Questions for the owner

  • Did Antonio take roof measurements or photos of Roof 2's framing from another spot, such as from above?
  • Which utility serves this address?
  • Do you want the brief to mention a target system size or budget? None was given.

What it does

Turns a surveyor's rough site notes into an organized design brief the designer can work from without calling the surveyor. It shows what was measured, what was found, and what is still missing.

Use it when: Use when a solar company needs to turn site survey notes, photos lists, or a surveyor's rough jottings into a clear design brief for the designer or engineer, such as: write up this survey, make a design brief, or hand this site off to design.

TFI STOREFRONTTOOLS · SKILLS · HELP FOR SMALL BUSINESS

Tools, AI skills and hands-on help for small businesses, from Thompson Foundry Innovations.

CONTACT US
© 2026 Thompson Foundry Innovations LLC · Designed and built in Fullerton, California